Release Notes
The notes below provide descriptions of the new features and changes introduced with each release of Eggplant DAI. You are strongly encouraged to read about the relevant changes whenever you upgrade from an earlier version.
Potential compatibility issues are highlighted.
System Requirements
Operating Systems
- Windows: Windows Server 2019 or 2016 is recommended for production use but Windows 10 and 11 are also supported.
Hardware Requirements
- RAM: 8 GB minimum
- Disk Space: 5 GB minimum for trial deployments, 100 GB minimum for production deployments
- Processor: 64-bit Intel Core 2.3 GHz or equivalent (4+ cores or 8+ threads recommended)
- Eggplant DAI 6.5 is the latest supported release.
- You must upgrade to at least Eggplant DAI 6.4 before you start your installation.
- Before you upgrade, make sure that you take a backup of your files and database. If there is a problem with your upgrade, you will need to restore to this point.
- Eggplant DAI 6.5 is only compatible with Eggplant Functional 22.5 and later. When upgrading to Eggplant DAI 6.5, you must also update your version of Eggplant Functional.
Release 6.5
Test Case result trend
DAI provides a result trend of the last ten test runs in the test case view. This is an overview of test runs that have completed successfully or failed. The result trend will enable you to understand how well your test runs are performing. The trend also shows when the test was run and its duration.
Support for Citrix
Added native support for Citrix Desktop connections
Support for Sauce Lab Devices
Added native support for Sauce Labs Browser and Sauce Labs Real Devices (private and Public) in DAI.
Automatic Cleanup of DAI server logs
DAI can be set to automatically delete DAI server log files.
Release 6.4
Test Results by Email
You can now receive notification of your test results by email. The results will show whether a test has been successful or not. Email notification will allow you to take prompt action and save you from having to constantly log into DAI to check the status of your test configuration runs.
Calendar View for Scheduling Test runs
The new calendar provides you with full visibility of your test configuration schedules. The new calendar will facilitate optimisation of your execution environments according to availability of the environments and licenses.